Commercial EV Infrastructure
How We Build Reliable, Revenue-Grade EV Infrastructure for Your Business

We design, install, and commission high-throughput dual-gun DC fast chargers for commercial hubs, fleet depots, and public charging networks. Each deployment is backed by real-time monitoring and on-site acceptance testing to ensure revenue-grade uptime from day one. Our dual-gun units let you charge two vehicles simultaneously or deliver full power to a single bay, maximising both throughput and flexibility. From the initial walkthrough to the final handover, every step is executed by certified local engineers who understand Philippine grid conditions and site constraints.
Site Survey & Load Study. Our engineers conduct a full electrical load assessment and spatial survey to size the charger and plan cable routing before any equipment ships. We also check your existing transformer capacity and recommend upgrades if needed, so you never face surprises at commissioning.
Civil Works & Trenching. We handle concrete pads, cable trenches, and mounting pedestals — all coordinated with your facilities team to minimise disruption to daily operations. Every civil package is pre-approved with engineering drawings before a single shovel hits the ground.
Installation & Commissioning. Certified technicians install the unit, terminate power and data cabling, then run a full acceptance test protocol including OCPP backend registration and load-bank verification. We do not leave site until both guns deliver rated power under real-world test conditions.
Handover & Training. Your operations team receives a comprehensive half-day training session covering daily health checks, the remote monitoring dashboard, common fault diagnosis, and our escalation paths. A laminated quick-reference card stays on site for your shift staff.